Skip to product information
1 of 5

TWICE BREWED

Follow The Critical Path Heavy Faded T-Shirt (Washed Black)

Follow The Critical Path Heavy Faded T-Shirt (Washed Black)

Regular price £22.00
Sale price £22.00 Regular price
Sale Sold out
Tax included. Shipping calculated at checkout.
Size

Follow The Critical Path Heavy Faded Tee - Washed Black 

Follow The Critical Path with this fantastic t-shirt.  Designed by Josh Beamish and printed on a premium AS Color heavy faded t-shirt, featuring big back print and Twice Brewed text on front left chest.

The AS Colour Heavy Faded Tee, crafted from 100% carded cotton for durability and comfort. With a heavy 240 GSM weight and garment dyed finish, it features a boxy relaxed fit, dropped shoulders, and twin-stitched wide neck ribbing. Built to last for a timeless, relaxed look.

Sizes; S, M, L, XL, 2XL, unisex. 

View full details